Kampala City Council Authority (KCCA) has identified 135 acres of land in Dundu, Mukono District where it plans to open up a new landfill and seal off the Kiteezi one.
This was revealed by the Project Coordinator in KCCA’s waste management department and Landfill engineer, Joel Mwesigye during a tour by Parliamentary committee on Climate Change of Kiteezi Landfill.
According to Mr. Mwesigye, the facility is over utilized and has become hazardous to the surrounding with air pollution as the major effect.
This exercise was part of the Committee’s oversight visits to KCCA’s waste management facilities.
The committee started with a visit to the land fill at Kiteezi, Mpererwe where the authority disposes 1200 out of 2000 tonnes of waste generated daily in the city.
The KCCA team is led by Minister Minsa Kabanda and the State Minister for KCCA & Metropolitan Affairs, Kyofa Kabuye.
During it’s visit, the climate change committee observed that at Kiteezi landfill:
▪︎70% waste collected is from house holds
▪︎50% waste collected is liquid & limits generation of energy
▪︎KCCA is not facilitated to collecte all waste generated in the city.
Kiteezi landfill located in Mpererwe is Uganda’s largest and only sanitary engineered landfill with its highest end rising up to 10 metres, sitting currently on 36 acres of land. It receives 1000 kilos of waste daily with under 400 salvagers working in the landfill every day in harmony.
The mysteries of Kiteezi’s great size arise from the slow decomposition process that is a result of unsorted waste, that is 15% inorganics and 85%organics collected from source together and disposed of at Kiteezi.
Out of the 15% of the organics, 1-2 tons of that is plastic, and of which 30% is salvaged leaving an alarming 70% – which includes polythene paper bags, commonly known as “kaveera”.

