Karuma Bridge to Close for Three Months of Major Repairs Starting September 23
Minister Katumba Wamala at Karuma Bridge
The Ministry of Works and Transport has announced that Karuma Bridge, a vital transportation link in Uganda, will be closed to all traffic starting Monday, September 23, 2024. This closure is part of a larger restoration project to address significant structural issues. Minister of Works and Transport Gen. Edward Katumba Wamala made the announcement, stating that the bridge's concrete deck will be demolished to allow major repair work, which is expected to last for three months.
Karuma Bridge plays a critical role in connecting Uganda’s northern region with other parts of the country, as well as serving as a key link for international trade with South Sudan and the Democratic Republic of Congo. Due to this importance, the bridge has been under significant scrutiny, with repair work beginning earlier this year after the Uganda National Roads Authority (UNRA) identified severe structural weaknesses, including fatigue and corrosion of the steel reinforcements beneath the bridge.
In a prior update in August, UNRA noted that several key rehabilitation steps had been implemented, including the creation of a support platform beneath the bridge to ensure the safe continuation of repairs. However, due to the extent of the damage to the concrete deck, a full closure is now required to facilitate further work. The closure will allow the contractor to completely demolish and replace the deck to restore the bridge's structural integrity.
During this period, alternative routes have been arranged for motorists. Gen. Wamala advised travelers from Kampala heading towards Gulu and West Nile to use the Luwero—Kafu—Masindi—Paraa (Murchison Falls National Park) route, which will connect them to Pakwach or Gulu via Olwiyo. Motorists heading to Lira are encouraged to take the Rwenkunye—Apac route via the Masindi Port Ferry or alternatively use the Iganga—Nakalama—Tirinyi—Pallisa—Kumi—Soroti—Lira route.
The closure is part of a broader plan by the government to not only rehabilitate but also replace ageing infrastructure. UNRA confirmed that the government is in the advanced stages of planning the construction of a new bridge at Karuma, alongside plans for other key infrastructure projects, including new bridges at Pakwach, Masindi Port, and across the River Nile at Laropi. The new Karuma Bridge project is currently in the design phase, with procurement for a contractor expected to begin soon.
While these repairs are expected to cause some disruption, both UNRA and the Ministry of Works have emphasized that they are necessary for long-term safety and the continued operation of the bridge. The government has expressed regret for any inconvenience caused and urged the public to use the alternative routes provided during the three-month closure period.
This repair work underscores the importance of infrastructure maintenance in Uganda, as the Karuma Bridge serves as a major artery for both local and international transport, supporting trade and the movement of goods across East Africa.

